It enables you to view pending loads in the branch, the deadlines and current status of transportation. The loading schedule is previously performed in the System, based on customer transport documents. You don't need to perform systematic operations to confirm a trip. You can also perform the schedule from the generated CTRC, but the view is from the customer transport documents.
Important:
|
...
Requirements
1. The Vehicle must be registered.
...
The System displays the CTRC generation.
Important: After confirmation, you can issue the Transport Bill of Lading. If the lot is Electronic, all communication is performed through CT-e, so you can follow it by the Electronic Transport Bill of Lading Monitor. |
...
See Also