Execute

It is possible to associate the execution asset with the provision control.

75192f68-6005-4ec2-a0fa-4a72ba8d1cb5Important:

It is possible to delete the execution asset using the Fixed Asset routine and transfer it using Transfer

Requirements

Having the provision control with the status: Updated or Performed or Execution Pending.
Having the confluencepage-e8b56b6e-9290-4ae7-a8d1-60e725a9d99c associated with the provision control.

Procedures

1. Select the desired provision register
2. In Related Features, click Execute.
3. Position on the Execution Assets grid and fill out data regarding the asset previously associated in the [F3] query available in the Base Code field.
4. Select the control and confirm operation.
5. After confirming, the provision control status is changed to A - Execution Pending.